Description
DECA BAYWALK 2 TOWNHOUSE-BARE UNIT W/O PARKING (Dumlog Talisay City, Cebu)
REGULAR UNIT:
Lot Area : 40 sq. m
Floor Area: 54.4 sq. m.
HOUSE DETAILS:
2 Storey Townhouse
Provision for 2 Bedrooms
1 Toilet and Bath
Living, Dining, Kitchen
Service Area
Total Contract Price: P 1,170,000.00
Reservation Fee: P 10,000.00
Deca Homes Baywalk Phase 2 – is the only affordable Houses for sale in Talisay City, Cebu. It is located adjacent to Deca Homes Baywalk Phase 1 with separate Entrance Gate and Guardhouse. Phase 2 has now new design with the façade and new color scheme.
REGULAR UNIT:
Lot Area : 40 sq. m
Floor Area: 54.4 sq. m.
WITH GARAGE UNIT:
Lot Area: 52 sq. m.
Floor Area: 54.4 sq. m.
PROJECT SPECIFICATIONS:
*Bare Unit (no tiles, no partition, no paint)
*Rare window closet, lavatory, shower, faucet and wall tiles are provided.
*Width of minor roads are 6.5m while major roads are 10.00 meters wiede.
*Easements of Baywalk Talisay Phase 2 either from the seawall /river shall not be used by the adjoining homeowners.
*Any given schedule of house completion and turn over is only a projection, target or an estimate w/c is subject to slippage for whaterver reason & circumstances that may rise.
POST MOVE IN GUIDELINES:
1. House alterations and improvements requires a work permit, submission of plan of works and payment construction bond (P 3,500.00 refundable after work completion)
2. Major House alterations and improvements requires building permit from the City Engineer’s Office (OBO) and must conformed with the theme of the subdivision particularly the color of the facade of the house.
3. Water Connection and Meter Deposit is P 3,750.00 while Electric connection and meter deposit may cost at P 3,350,00 while the electric material for the electrical pedestal post may cost P 3,000.00
4. Complaint for wear and tear, minor hair line cracks, broken jalousie windows are deemed waived after 7 days from the release of permit to occupy or omission to claim the permit to occupy after sufficient notice
5. Buyer will be the one to facilitate and process their application for electric connection since most of the electric provider will require an appearance of the appicant or their duly authorize reperentative.
6. An allowance of 1 and 1/2 year shall be allocated for conversion of TCT specially for SPOT CASH account.